Saturday, 7 September 2019

A Bit of Progress!

It has been a long time since November 2018, when I made my last entry about the construction of Burghmire. Unfortunately, a number of unavoidable things got in the way of modelling.

The most recent meeting of my local 2mm Scale Association area group presented a good opportunity to get things moving again. I busied myself by sticking all the sleepers in position ready to lay rails on the main fiddle yard board. Since then I have soldered most of the rail in position. I shall have to procure more rail before I can complete the job. Enough laid for the time being though. Everything lines up well, which is a great relief. The Templot plan worked perfectly.


In operation, two of the static left hand roads are through roads from the scenic section. These are the main line (third from the bottom) and the gas works siding (fifth from the bottom). All the rest are storage sidings. On the sector plate, one of the roads will act as a shunting spur. The other four roads will be for stock storage.


No comments:

Post a Comment

Note: only a member of this blog may post a comment.